New ALAS Emirates Ready Mix Plant Rises at Dubai Industrial City
ALAS Emirates Ready Mix is progressing with the development of its new facility at Dubai Industrial City, combining high production capacity with advanced batching, cooling and quality-control systems designed for reliable concrete production.
Construction has progressed significantly over the summer months, bringing the new facility visibly closer to completion. Despite complications caused by the conflict in the region and related logistical challenges, the project has continued to move forward. ALAS is currently targeting the start of operations by the end of this year.
The 160,000 sq. ft site will bring together a modern office building, two advanced batching plants and supporting infrastructure, including a laboratory, material storage and workshop.
At the heart of the facility are two Liebherr batching plants supplied from Germany, each designed for a production capacity of 4 m³ per batch. Together, the plants will provide a total production capacity of up to 400 m³ per hour, supported by a high-performance German control system with a modern interface fully integrated with the company’s ERP systems.
Designed for Dubai’s Climate
A dedicated cooling system will help maintain consistent concrete temperatures during production. The facility will include two KTI ice production units, each with a capacity of 100 tonnes per day and supported by 100-tonne storage. Two additional KTI cooling units will provide a combined cooling capacity of approximately 375 m³ per day, helping ensure consistent temperature control during production.
The raw material storage and handling system has also been designed to support efficient material flow, monitoring and uninterrupted production. The layout and technology are intended to maintain material integrity while supporting efficient day-to-day operations.
Integrated Quality Control
Quality control will be supported by a fully equipped laboratory located within the facility. The laboratory will enable continuous testing, mix development and performance monitoring, with production and testing processes closely integrated to ensure consistency and compliance with project specifications and industry standards.
The facility will also incorporate advanced water treatment and concrete recycling systems, supporting more efficient use of resources and compliance with environmental requirements.
Built for Reliable Production
The technical solution reflects ALAS Emirates Ready Mix’s approach to entering the Dubai market with a facility designed not only for increased capacity, but also for consistent performance and operational reliability.
“From the outset, the objective was not only to expand capacity, but to introduce a facility that reflects our standards in quality, efficiency and reliability, “said Chris Meyrick, General Manager of ALAS Emirates Ready Mix.” Dubai is a highly competitive market, and the technical performance of the plant will be a key factor in how we support our clients.”
The Dubai expansion will strengthen ALAS Emirates Ready Mix’s presence across the UAE and provide additional capacity to support the construction sector as the company continues to develop its operations in the region.
Stay Updated
Follow ALAS on social media for the latest news, updates and insights.